Wooden Door Pricing Spreadsheet: How to Compare Three Factory Offers on One Page
Three door quotations rarely cover the same scope, so the lowest total is often misleading. This guide shows how to normalise offers on one page and compare door manufacturer offers fairly.
If you need to compare door manufacturer offers, the first rule is simple: never compare totals until the scope behind them is identical. One factory may price leaves only, another includes frames and hardware prep, and a third quotes delivered to site. A one-page normalisation sheet puts all three on the same footing, so the decision rests on facts rather than on the headline number.
Below you will find a practical layout you can copy into any spreadsheet, followed by guidance on how to fill it, what to question and how to score the results.
Why raw quotations cannot be compared directly
Quotations from different suppliers are written in different formats, with different units, exclusions and assumptions. Even when the door schedule is the same, the prices often describe different products.
Typical sources of distortion include:
- Scope: leaf only, leaf with frame, or complete door set with hardware.
- Quote basis: per leaf, per set or per square metre.
- Specification: core type, leaf thickness, veneer grade, lacquer system and edge treatment.
- Commercial terms: Incoterms, packing, validity period and payment milestones.
- Exclusions: sampling, installation, spare leaves, documentation or testing.
A hotel door tender often contains several hundred openings in many types, so small differences per leaf multiply quickly. That is why a structured sheet pays for itself.
Step 1: Lock the reference scope before you collect offers
Comparison starts before the quotations arrive. Send every supplier the same door schedule, the same specification notes and the same list of required deliverables. If suppliers receive different information, you will never be able to normalise the results.
Your reference package should include:
- A door schedule with door type, size, handing, fire or acoustic requirement and quantity.
- Finish references, such as veneer species, RAL or Pantone codes, or sample boards.
- Hardware preparation requirements: hinge type and number, lock routing, closer fixing, cable paths for electronic locks.
- Delivery location and the Incoterm you want priced.
- Requested extras: mock-up door, spare percentage, installation supervision or on-site fitting.
Ask each supplier to price against this package and to list every deviation clearly. A supplier who changes the specification without saying so is giving you a lower price for a different product.
Step 2: Build the one-page normalisation table
The sheet below has one row per comparison item and one column per supplier. Keep it on a single page so the whole team, from the procurement manager to the designer and owner, can read it in one view.
| Item | Supplier A | Supplier B | Supplier C |
|---|---|---|---|
| Quote basis (leaf, set, m²) | |||
| Leaf thickness and core type | |||
| Surface and finish system | |||
| Edge detail and sealing | |||
| Frames and architraves included? | |||
| Hardware supplied or prepared only | |||
| Fire or acoustic test evidence | |||
| Mock-up or sample cost | |||
| Packing method | |||
| Incoterm and delivery point | |||
| Installation included? | |||
| Lead time and what starts the clock | |||
| Payment terms | |||
| Quote validity | |||
| Normalised total (same scope) |
The last row is the one that matters. It is the total after you have added the missing items to each offer so that all three describe the same scope.
Step 3: Normalise the price, line by line
Normalising means adjusting each offer to the reference scope. If Supplier A includes frames and Supplier B does not, ask Supplier B to price the frames, or add a clearly marked estimate and label it as such. Do not invent numbers; request written confirmation wherever possible.
Convert to a common unit
Choose one basis, usually price per complete door set, and convert the others. If a quote is per square metre, multiply by the actual leaf area from your schedule. Metric units should come first, for example 900 x 2100 mm (35.4 x 82.7 in), so that area calculations are consistent across suppliers.
Align the delivery terms
An EXW price and a DAP price cannot be set side by side. EXW leaves export clearance, freight and insurance to you, while DAP places delivery to the named destination on the seller, excluding import duties. Ask each supplier to quote the same Incoterm, or add freight estimates from a forwarder you trust so that the comparison stays fair.
Treat packing as a real cost item
Doors are damaged more often in transit than in production. Compare how each supplier protects leaves, frames and finished edges, for instance film, corner protection, foam and crating. Cheaper packing is not a saving if it leads to rework at the site.
Step 4: Compare the specification, not just the description
Two offers can both say "veneered flush door" and still differ greatly. Look at what sits behind the label.
- Core: solid timber frame, particleboard, honeycomb or mineral core affects weight, screw holding and fire or acoustic performance.
- Thickness: a 40 mm (1.6 in) leaf and a 45 mm (1.8 in) leaf behave differently on hinges and in acoustic tests.
- Finish system: the number of lacquer coats and the type of coating influence scratch and stain resistance.
- Edges: edge banding and sealing are where hotel doors usually fail first, especially near bathrooms.
- Hardware prep: routing for locks, closers and cable paths should be shown in the offer, not left for the site team.
If a supplier's description is thin, ask for a product data sheet and a sample. A professional factory will answer these questions without hesitation.
Step 5: Look at risk, not only cost
The cheapest compliant offer is not always the safest. Add a short risk block under the table and score each supplier from one to five on points that affect your programme.
- Evidence: are test reports and certificates provided for the fire or acoustic requirement, and do they match the door you will actually receive?
- Sampling: is a prototype or mock-up door offered, and who pays for it?
- Capacity and lead time: is the stated lead time realistic for your quantity, and what event starts the clock, for example deposit or finish approval?
- Change handling: what can still be altered after production starts?
- Communication: are drawings, questions and answers handled clearly and promptly?
Delays on finish approval and hardware details are common causes of late delivery, so a supplier who raises these points early is often showing experience rather than difficulty.
Step 6: Read the exclusions and fine print
Exclusions usually hide the real difference between offers. Read each quotation for phrases such as "by others", "subject to confirmation" and "not included". Common gaps are:
- Spare leaves or a percentage for site damage.
- Documentation such as packing lists, test reports and maintenance information.
- Protective film removal, touch-up kits or finishing on site.
- Storage, unloading and last-mile handling at a remote site.
- Price validity that expires before your decision date.
Add each gap as a row in your table. A blank cell is information in itself and should trigger a question to the supplier.
Step 7: Score and decide
Once the normalised totals are in place, weight the factors that matter to your project. A simple approach is to give price a fixed share and split the rest across specification, evidence, lead time and risk. Agree the weighting with the owner and designer before opening the offers, so the result is not argued backwards from a preferred supplier.
Where two offers are close, request a short clarification round with the same questions for both. Updated quotations in the same format keep the comparison clean.
Common mistakes to avoid
- Comparing totals before aligning scope and Incoterms.
- Accepting a substitute core or finish without recording it.
- Ignoring packing, sampling and documentation costs.
- Letting quotation validity lapse during internal approvals.
- Choosing on price alone when the lead time or evidence is weak.
Conclusion
To compare door manufacturer offers properly, fix the scope first, convert every price to the same unit and terms, and judge specification and risk alongside cost. One page, one table and one set of questions are usually enough to make three very different quotations comparable, and to give your team a clear, defensible decision.
Next step
If you would like Palmiye to price your door package in a format that is easy to compare, send us your door schedule and drawings. We will review the scope, point out any gaps and come back with a clear quotation for your project.
Sıkça Sorulan Sorular
How many suppliers should I compare for a hotel door tender?
Three is a practical number for most projects. It gives you enough range to see where prices and specifications differ without making the evaluation unmanageable. For very large or multi-property programmes, you may shortlist more, but keep the same schedule and format for every supplier.
Should I compare door prices per leaf or per door set?
Choose one basis and convert everything to it. Per door set is usually clearest because it includes the frame and any supplied hardware. If suppliers quote per square metre, calculate the actual area from your schedule so that the totals can be compared directly.
Why is the cheapest door quotation sometimes the most expensive in the end?
A low price may exclude frames, hardware preparation, packing, documentation or delivery, or it may assume a lighter core or thinner finish. Rework, damage in transit and delays can then add cost. Normalising scope shows whether the price is genuinely lower.
Do I need to compare Incoterms between suppliers?
Yes. EXW, FOB, CIF and DAP place different costs and risks on the buyer. Ask all suppliers to quote the same Incoterm and destination, or add forwarder estimates to align them. Otherwise the totals describe different parts of the supply chain.
What documents should I ask for when evaluating door suppliers?
Request a product data sheet, finish samples, shop drawings or elevations, and test reports relevant to your fire or acoustic requirements. Also ask for a packing description and a clear lead time statement. These show how well the offer matches your specification.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.